System Information | Schedule Counts |
Status: Active System Type: Community Population Served: 30 | Active: 2 Show Only Active Inactive: 0 Expired: 3 |
Routine Sampling Schedules For Chemicals | ||||||||
Facility ID |
Name | Status | Test Group | Samples Required |
Sampling Interval |
Start | End | Notes |
DIST-A | DISTRIBUTION SYSTEM | A | LEAD & COPPER | 5 | 6 Months | 01/01/2024 | Open | |
DIST-A | DISTRIBUTION SYSTEM | A | STAGE 2 DBP | 1 | Yearly | 01/01/2022 | Open | Sample a dual sample set every August at 3788 Pinetop Drive. |
Expired Schedules | ||||||||
DIST-A | DISTRIBUTION SYSTEM | A | LEAD & COPPER | 5 | 6 Months | 01/01/2020 | 12/31/2021 | |
DIST-A | DISTRIBUTION SYSTEM | A | LEAD & COPPER | 5 | Yearly | 01/01/2022 | 12/31/2023 | Collect samples between June 1 and September 30 every year from cold water, drinking water taps. |
DIST-A | DISTRIBUTION SYSTEM | A | STAGE 2 DBP | 2 | Yearly | 01/01/2020 | 08/31/2021 | Collect two dual sample sets between June 1 and September 30. One sample must be collected near the entry point and the other near the point of maximum residence time. |