OHA Drinking Water Services
OR41
PWS ID: 90513 ---- PGE CARTY GENERATING STATION
System Information     Schedule Counts
Status:  Active
System Type:  Oregon Very Small
Population Served:  20
 Active:  2     Show Only Active
Inactive:  2  Show Inactive
Expired:  14  Show Expired
                     Show All

Routine Sampling Schedules For Chemicals
Facility
ID
Name Status Test Group Samples
Required
   Sampling
Interval
Start End    Notes
EP-A EP FOR BOEING WELLAARSENIC1  Yearly01/01/2020Open
EP-A EP FOR BOEING WELLANITRATE1  Yearly01/01/2002Open
Inactive Facility Schedules
POU-6POU FOR ARSENIC REMOVALIARSENIC2  Quarterly10/01/201106/30/2012Six (6) POU units - sample two (2) units every quarter per sampling plan.
POU-6POU FOR ARSENIC REMOVALIARSENIC2  Yearly01/01/201301/31/20202 samples per year, rotating between the six POU units per sampling plan
Expired Schedules
DIST-ADISTRIBUTION SYSTEMAHAA5 & TTHM1  3 Years01/01/200512/31/2013Sample between June 1 and Sept. 30.
DIST-ADISTRIBUTION SYSTEMAHAA5 & TTHM1  Yearly01/01/200412/17/2004Sample Between June 1st and Sept 30th Each Year
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER5  3 Years01/01/200212/31/2020system changed to state reg 1/12/2021, LCR schedules removed
DIST-ADISTRIBUTION SYSTEMASTAGE 2 DBP1  3 Years01/01/201512/31/2020System changed to state reg 1/12/2021, DBP schedules removed
DIST-ADISTRIBUTION SYSTEMASTAGE 2 DBP1  Yearly01/01/201412/31/2014Sample in September
EP-AEP FOR BOEING WELLAARSENIC1  3 Years01/01/200212/31/2009
EP-AEP FOR BOEING WELLAARSENIC1  Quarterly01/01/201006/30/2011arsenic samples to be collected from POU units starting 3rd quarter 2011 - BG
EP-AEP FOR BOEING WELLAARSENIC1  Quarterly04/01/201712/31/2019
EP-AEP FOR BOEING WELLAIOC1  9 Years01/01/200212/31/2020system changed to state reg 1/12/2021, IOC/SOC/VOC schedules removed
EP-AEP FOR BOEING WELLANITRITE1  9 Years01/01/200212/31/2020system changed to state reg 1/12/2021, IOC/NO2 schedules removed.
EP-AEP FOR BOEING WELLASOC1  3 Years01/01/200212/31/2020system changed to state reg 1/12/2021, IOC/SOC/VOC schedules removed
EP-AEP FOR BOEING WELLAVOLATILE ORGANICS1  3 Years01/01/200212/31/2020system changed to state reg 1/12/2021, IOC/SOC/VOC schedules removed
POU-6POU FOR ARSENIC REMOVALIARSENIC2  Quarterly10/01/201106/30/2012Six (6) POU units - sample two (2) units every quarter per sampling plan.
POU-6POU FOR ARSENIC REMOVALIARSENIC2  Yearly01/01/201301/31/20202 samples per year, rotating between the six POU units per sampling plan