OHA Drinking Water Services
OR41
PWS ID: 00279 ---- ESTACADA, CITY OF

Most Recent Water System Survey
Survey date: Jul 26, 2023
Notification date: Aug 07, 2023 (12 days)
Regulating agency: DWS (REGION 1)
Survey frequency: 5 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Significant deficiencies and unmet rule requirements: Outstanding Performer!
No significant deficiencies or unmet rule requirements were identified for this survey.


 Hide Site Visit History
Water System Site Visit History
Reason Visit date Frequency Next due Notification date
(Days after survey)
Responsible
agency
Comments and
significant deficiencies or unmet rule requirements
Sanitary Survey, Finished (SNSV) 07/26/2023 5 YR  * 08/07/2023 (12) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 07/26/2023 3 YR 07/26/2026 08/07/2023 (12) REGION 1 No details
Sanitary Survey, Finished (SNSV) 07/15/2020 3 YR  * 08/13/2020 (29) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 07/15/2020 3 YR 07/15/2023 08/13/2020 (29) REGION 1 No details
Sanitary Survey, Finished (SNSV) 10/10/2017 3 YR  * 12/01/2017 (52) REGION 1 No details
Water Treatment Plant Site Visit (TRTP) 10/10/2017 3 YR 10/10/2020 12/01/2017 (52) REGION 1 No details
Sanitary Survey, Finished (SNSV) 09/30/2014 3 YR  * 12/31/2014 (92) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 09/30/2014 1 YR 09/30/2015 12/31/2014 (92) REGION 1 No details
Sanitary Survey, Finished (SNSV) 05/19/2011 3 YR  * 09/07/2011 (111) DWP Show details
Water Treatment Plant Site Visit (TRTP) 05/19/2011 3 YR 05/19/2014 09/07/2011 (111) DWP Show details
Sanitary Survey, Finished (SNSV) 12/10/2008 3 YR  * 01/28/2009 (49) DWP Hide details
  Comments:
The deficiencies noted are as follows:

Surface Water Treatment Deficiencies
1. Print filter backwash turbidity profiles quarterly.
2. Take residual chlorine samples every day from a representative location in the distribution system

Finished Water Storage Deficiencies
3. A screen or flap valve must be installed on the outlet of the tank drains/overflows to prevent blocking or entry of contamination at reservoirs 1 and 3 and both clearwells.
This site visit has not been entered into the deficiency database.

Water Treatment Plant Site Visit (TRTP) 12/10/2008 3 YR 12/10/2011 01/28/2009 (49) DWP Show details
Sanitary Survey, Finished (SNSV) 12/07/2005 3 YR  * 01/11/2006 (35) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 12/07/2005 1 YR 12/07/2006 01/11/2006 (35) REGION 1 No details
Sanitary Survey, Finished (SNSV) 04/27/2001 3 YR  * DWP Show details