OHA Drinking Water Services
PWS ID: 94418 ---- BPA-CELILO/BIG EDDY

Most Recent Water System Survey
Survey Date: Feb 16, 2023
Notification Date: Feb 16, 2023 (0 days)
Regulating Agency: WASCO COUNTY
Survey Frequency: 5 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Deficiencies:
Category Deficiency Due Date Resolved Date
Operator Certification No certified operator at required levelJun 22, 2023
Well Construction Sanitary seal and casing not watertightJun 22, 2023
Well Construction Does not meet setbacks from hazardsJun 22, 2023
Bold text indicates that resolving this deficiency is a top priority.


 Show Site Visit History




For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA For SDWIS: 1753