| Deficiencies: |
| Category |
Deficiency |
Due Date |
Resolved Date |
| Management & Operations |
No operations and maintenance manual | Dec 16, 2025 |
|
| Monitoring & Reporting |
Monitoring not current | Dec 16, 2025 |
|
| Well Construction |
Sanitary seal and casing not watertight | Dec 16, 2025 |
|
| Disinfection |
DPD or EPA approved method not used | Dec 16, 2025 |
|
| Disinfection |
Chlorine not measured & recorded as required | Dec 16, 2025 |
|
| Disinfection |
Minimum CT requirement not met all times | Dec 16, 2025 |
|
| Disinfection |
No means to adequately determine flow rate on contact chamber effluent line | Dec 16, 2025 |
|
| Disinfection |
pH, temperature, and chlorine residual not measured daily at first user | Dec 16, 2025 |
|
| Disinfection |
Failure to calculate CT values correctly | Dec 16, 2025 |
|
| Disinfection |
No means to adequately determine disinfection contact time under peak flow and minimum storage conditions | Dec 16, 2025 |
|
| Other Treatment |
Non-NSF approved chemicals | Dec 16, 2025 |
|
| Surface Water Treatment |
Turbidity standards not met | Dec 16, 2025 |
|
Bold text indicates that resolving this deficiency is a top priority.
|