System Information     Schedule Counts
Status:  ACTIVE
System Type:  Community
Population Served:  300
 Active:  20     Show Only Active
Inactive:  0
Expired:  7

PWS #:  00459   GLENMORRIE COOPERATIVE ASSN    Routine Sampling Schedules For Chemicals
Facility
ID
Name Status Test Group Samples
Required
   Sampling
Interval
Start End    Notes
DIST-A DISTRIBUTION SYSTEMALEAD & COPPER5  Yearly01/01/2023OpenCollect samples between June 1st and Sept 30th
DIST-A DISTRIBUTION SYSTEMASTAGE 2 DBP2  Yearly01/01/2023OpenCollect one dual sample set at each monitoring location between June 1 and September 30 during the 2023 calendar year.
EP-A EP for WELL #2AARSENIC1  9 Years01/01/2008Open
EP-A EP for WELL #2AIOC1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
EP-A EP for WELL #2ANITRATE1  Yearly01/01/2002Open
EP-A EP for WELL #2ANITRITE1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
EP-A EP for WELL #2ARAD - GROSS ALPHA1  9 Years01/01/2008Open
EP-A EP for WELL #2ARAD - RADIUM 226/2281  9 Years01/01/2014Open
EP-A EP for WELL #2ARAD - URANIUM1  9 Years01/01/2014Open
EP-A EP for WELL #2ASOC1  3 Years01/01/2002Open
EP-A EP for WELL #2AVOLATILE ORGANICS1  3 Years01/01/2002Open
EP-B EP for WELL #3AARSENIC1  9 Years01/01/2008Open
EP-B EP for WELL #3AIOC1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
EP-B EP for WELL #3ANITRATE1  Yearly01/01/2002Open
EP-B EP for WELL #3ANITRITE1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
EP-B EP for WELL #3ARAD - GROSS ALPHA1  9 Years01/01/2008Open
EP-B EP for WELL #3ARAD - RADIUM 226/2281  9 Years01/01/2014Open
EP-B EP for WELL #3ARAD - URANIUM1  9 Years01/01/2014Open
EP-B EP for WELL #3ASOC1  3 Years01/01/2002Open
EP-B EP for WELL #3AVOLATILE ORGANICS1  3 Years01/01/2002Open
Expired Schedules
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER5  3 Years01/01/200512/31/2021Sample Between June 1st and Sept 30th
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER10  6 Months01/01/202212/31/2022Collect samples from cold water, drinking water taps.
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER5  Yearly01/01/200212/31/2003Sample Between June 1st and Sept 30th
EP-AEP for WELL #2ARAD - RADIUM 226/2281  6 Years01/01/200812/31/2013
EP-AEP for WELL #2ARAD - URANIUM1  6 Years01/01/200812/31/2013
EP-BEP for WELL #3ARAD - RADIUM 226/2281  6 Years01/01/200812/31/2013
EP-BEP for WELL #3ARAD - URANIUM1  6 Years01/01/200812/31/2013


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA

Need help? Email Drinking Water Services for assistance.