System Information     Schedule Counts
Status:  Active
Type:  C
Population:  56
 Active:  11
Inactive:  0
Expired:  14  Show Expired

PWS #:  00999   LAKESIDE MOBILE HOME PARK    Routine Sampling Schedules For Chemicals
Facility
ID
Name Status Test Group Samples
Required
   Sampling
Interval
Start End    Notes
DIST-A Distribution SystemALEAD & COPPER5  3 Years01/01/2002OpenSample Between June 1st and Sept 30th
EP-A EP FOR WELL #1ANITRATE1  Yearly01/01/2002OpenEP-B designated wellfield sampling point. Only nitrate required at EP-A.
EP-B EP FOR WELL #3AIOC1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
EP-B EP FOR WELL #3ANITRATE1  Yearly01/01/2002Open
EP-B EP FOR WELL #3ANITRITE1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
EP-B EP FOR WELL #3ARAD - GROSS ALPHA1  9 Years01/01/2008Open
EP-B EP FOR WELL #3ARAD - RADIUM 226/2281  9 Years01/01/2014Open
EP-B EP FOR WELL #3ARAD - URANIUM1  9 Years01/01/2014Open
EP-B EP FOR WELL #3ASOC1  3 Years01/01/2002Open
EP-B EP FOR WELL #3AVOLATILE ORGANICS1  3 Years01/01/2002Open
POU-27 POU FOR ARSENIC REMOVALAARSENIC9  Yearly01/01/2021OpenCollect samples at one third of the POU devices every year. Every device must be tested at least once every three years.


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA