System Information     Schedule Counts
Status:  ACTIVE
System Type:  Community
Population Served:  115
 Active:  12     Show Only Active
Inactive:  0
Expired:  6

PWS #:  01062   RAINBOW ROCK VILLAGE MHP    Routine Sampling Schedules For Chemicals
Facility
ID
Name Status Test Group Samples
Required
   Sampling
Interval
Start End    Notes
CH-A COMMON HEADER FOR WTP-AATOTAL ORGANIC CARBON1  Monthly01/01/2004OpenRaw Water TOC Only Required for Reduction in DBP Monitoring
DIST-A DISTRIBUTION SYSTEMALEAD & COPPER5  3 Years01/01/2002OpenSample Between June 1st and Sept 30th
DIST-A DISTRIBUTION SYSTEMASTAGE 2 DBP1  Quarterly01/01/2021Open
EP-A EP FOR WTPAARSENIC1  9 Years01/01/2011OpenSchedule Reflects Monitoring Reduction Granted
EP-A EP FOR WTPAIOC1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
EP-A EP FOR WTPANITRATE1  Yearly01/01/2005Open
EP-A EP FOR WTPANITRITE1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
EP-A EP FOR WTPARAD - GROSS ALPHA1  9 Years01/01/2008Open
EP-A EP FOR WTPARAD - RADIUM 226/2281  9 Years01/01/2008Open
EP-A EP FOR WTPARAD - URANIUM1  9 Years01/01/2008Open
EP-A EP FOR WTPASOC1  3 Years01/01/2002Open
EP-A EP FOR WTPAVOLATILE ORGANICS1  Yearly01/01/2002Open
Expired Schedules
DIST-ADISTRIBUTION SYSTEMAHAA5 & TTHM1  Yearly01/01/200412/31/2013Sample between June 1 and Sept. 30.
DIST-ADISTRIBUTION SYSTEMASTAGE 2 DBP1  Yearly01/01/201412/31/2018Sample in September
DIST-ADISTRIBUTION SYSTEMASTAGE 2 DBP1  Yearly01/01/201912/31/2020Collect sample every November at Space #8.
EP-AEP FOR WTPAARSENIC1  Yearly01/01/200212/31/2007
EP-AEP FOR WTPANITRATE1  Quarterly01/01/200412/31/2004
EP-AEP FOR WTPANITRATE1  Yearly01/01/200212/31/2003


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA