System Information     Schedule Counts
Status:  Active
Type:  C
Population:  36
 Active:  2
Inactive:  0
Expired:  8  Show Expired

PWS #:  06041   RICE HILL WEST SUBDIVISION    Routine Sampling Schedules For Chemicals
Facility
ID
Name Status Test Group Samples
Required
   Sampling
Interval
Start End    Notes
DIST-A DISTRIBUTION SYSTEMALEAD & COPPER5  3 Years01/01/2018OpenCollect samples every third year at cold water drinking water taps.
DIST-A DISTRIBUTION SYSTEMASTAGE 2 DBP2  Yearly01/01/2020OpenCollect dual sample sets between July 1st and August 31st


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA