System Information     Schedule Counts
Status:  ACTIVE
System Type:  Non-transient Non-community
Population Served:  28
 Active:  8
Inactive:  0
Expired:  19  Show Expired

PWS #:  94800   REXIUS - COBURG    Routine Sampling Schedules For Chemicals
Facility
ID
Name Status Test Group Samples
Required
   Sampling
Interval
Start End    Notes
DIST-A DISTRIBUTION SYSTEMALEAD & COPPER5  3 Years01/01/2019OpenCollect samples from cold drinking water taps between June 1 and September 30.
DIST-A DISTRIBUTION SYSTEMASTAGE 2 DBP1  3 Years01/01/2017OpenCollect samples every three years in the 3rd calendar quarter.
EP-A EP FOR WELL #3AARSENIC1  9 Years01/01/2017OpenSchedule reflects monitoring reduction granted.
EP-A EP FOR WELL #3AIOC1  9 Years01/01/2017OpenSchedule reflects monitoring reduction granted.
EP-A EP FOR WELL #3ANITRATE1  Quarterly04/01/2022Open
EP-A EP FOR WELL #3ANITRITE1  9 Years01/01/2017OpenSchedule reflects monitoring reduction granted.
EP-A EP FOR WELL #3ASOC1  3 Years01/01/2017Open
EP-A EP FOR WELL #3AVOLATILE ORGANICS1  3 Years01/01/2017Open


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA