PWS ID: 00657 ---- PORTLAND WATER BUREAU
Plan Review Information
Plan Review Records
Plan ID Project
Name
Date All
Received
Request for
Additional Info
Site Plan
Evaluation/
Approval
Conditional
Approval
Preliminary
Approval
Date
Abandoned
Final
Approval
Reviewer
177-2021 Master Plan 11/04/2021 06/29/2022 CG
52-2020 Corrosion Control 04/02/2020 05/28/2020 04/15/2022 CG
56-2018 Greenleaf Pump Station 04/17/2018 05/01/2018 04/15/2020 CG
193-2014 Willamette Park Pump Station 11/07/2014 11/24/2014 09/04/2018 CG
190-2014 Tabor Adjustments Projects 10/31/2014 12/08/2014 07/30/2018 CG
172-2012 Saltzman Pressure Tank 11/05/2012 12/14/2012 CG
171-2012 Whitwood Reservoir 11/05/2012 12/14/2012 CG
170-2012 Burlingame Tanks Rehabilition 11/05/2012 12/14/2012 CG
42-2012 Kelly Butte Reservoir 03/27/2012 05/31/2012 02/24/2015 CG
30-2012 Forest Park Low Tank 02/22/2012 03/07/2012 09/18/2015 CG
201-2010 Powell Butte Reservoir 12/15/2010 01/11/2011 09/01/2015 CG
33-2004 Old Master Plan 01/17/2006 08/27/2007 KS
180-2005 Wells 28 & 34 Improvements 08/23/2005 09/29/2005 10/24/2005 KS
195-2003 Well #38, South Shore Well Field 09/10/2003 06/08/2006 06/27/2007 KS
64-2001 Groundwater Pump Station 03/23/2001 05/11/2001 02/27/2004 MW
8-2000 Headworks Intake 05/22/2000 01/18/2000 09/10/2003 CG
67-2000 New wells 35, 36, 37 04/18/2000 05/04/2000 07/20/2000 07/19/2001 CG
66-2000 Wells 26,29,32 04/17/2000 09/26/2000 04/19/2001 CG
300-1996 Corrosion Control 10/21/1996 10/01/1996 05/17/1999 MW
84-1994 OLD Master Plan 12/31/1994
42-2016 Washington Park Reservoir 3 07/29/2016 08/27/2021 CG
145-2022 Filtration CG
12-2023 Washington Park - Hypo Plan CG
 



For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA