System Information     Schedule Counts
Status:  ACTIVE
System Type:  Community
Population Served:  14,458
 Active:  3     Show Only Active
Inactive:  12  Show Inactive
Expired:  20
                     Show All

PWS #:  00594   CLACKAMAS RIVER WATER - CLAIRMONT    Routine Sampling Schedules For Chemicals
Facility
ID
Name Status Test Group Samples
Required
   Sampling
Interval
Start End    Notes
DIST-A DISTRIBUTION SYSTEMAASBESTOS, DIST1  9 Years01/01/2002OpenSchedule Reflects Monitoring Reduction Granted
DIST-A DISTRIBUTION SYSTEMALEAD & COPPER30  3 Years01/01/2017OpenSample between June 1st and September 30th
DIST-A DISTRIBUTION SYSTEMASTAGE 2 DBP4  Quarterly01/01/2020Open
Expired Schedules
DIST-ADISTRIBUTION SYSTEMAHAA5 & TTHM4  Quarterly01/01/200409/30/2013
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER30  3 Years01/01/200208/01/2005Schedule Reflects OR City S. Fork WB Joint Monitoring Plan
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER60  6 Months07/01/200812/31/2008Schedule Reflects OLD Joint Monitoring Plan: CRW, Oregon City, West Linn & SFWB
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER60  6 Months07/01/200912/31/2009No longer in any Joint Monitoring Plan. Signed BCA 2.17.2011 to resolve AL exceedance.
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER60  6 Months07/01/201206/30/2014
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER60  6 Months09/01/200506/30/2006Currently working on a new corrosion control plan.
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER30  Yearly01/01/201512/31/2016Sample between June 1st and September 30th
DIST-ADISTRIBUTION SYSTEMASTAGE 2 DBP4  Quarterly10/01/201312/31/2019Sample in Dec, Mar, June, and Sept
EP-BEP FOR WELLIARSENIC1  3 Years01/01/200805/31/2013
EP-BEP FOR WELLIIOC1  3 Years01/01/200805/31/2013
EP-BEP FOR WELLINITRATE1  Yearly01/01/200805/31/2013
EP-BEP FOR WELLINITRITE1  9 Years01/01/200805/31/2013
EP-BEP FOR WELLIRAD - GROSS ALPHA1  3 Years01/01/200812/31/2011
EP-BEP FOR WELLIRAD - GROSS ALPHA1  Quarterly01/01/201203/31/2012re-evaluate this summer to reduce monitoring frequency.
EP-BEP FOR WELLIRAD - RADIUM 226/2281  3 Years01/01/200812/31/2011
EP-BEP FOR WELLIRAD - RADIUM 226/2281  Quarterly01/01/201203/31/2012re-evaluate this summer to reduce monitoring frequency.
EP-BEP FOR WELLIRAD - URANIUM1  3 Years01/01/200812/31/2011
EP-BEP FOR WELLIRAD - URANIUM1  Quarterly01/01/201203/31/2012re-evaluate this summer to reduce monitoring frequency.
EP-BEP FOR WELLISOC2  3 Years01/01/200805/31/20132 Consec. QT Samples
EP-BEP FOR WELLIVOLATILE ORGANICS1  3 Years01/01/200805/31/2013


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA