PWS ID: OR41 01174
PWS Name: BUELL-RED PRAIRIE WD
 
Who Was Contacted: Brandon Ford
Contact Phone: 503-843-2885 (Email address hidden)
Contact Date: 06/25/2025
Contacted By: HOFELD, EVAN (DWP)
Contact Method/Location: Email
 
Assistance Type: VIOLATION RESPONSE
 
Details: June 25, 2025 Update - Brandon emailed that today's Skid 1 was 0.011 psi/min with an LRV of 4.433. Skid 1 LRV, since the problem occurred, hasn't changed at all from 4.433. On the graph it shows a consistent straight line that says the LRV figure is instead 4.380. The records he was taking from before the PDT/LRV issue started were varying quite a bit and he was wondering if something in the program is messed up or scaled wrong. I requested a screen shot of the SCADA screen. Brandon sent the image and said that he found two leaks on Skid 2. He fixed one of the leaks and got the PDT/LRV to 0.054-log at 3.870 psi/min and will have the other leak fixed by tomorrow. I replied that I was able to match the calculation for LRV for skid 2 when manually calculating LRVambient in an Excel spreadsheet, but I was not able to match the LRV value shown for skid 1. I pointed out that this was likely due to the flow rate being zero. I also noted that the maximum TMP allowed is 29 psid for the BRPWD system and that TMP was about 7.5 – 8 psid back in March 2024 for basically the same flow as yesterday’s TMP of 21-25 psid.

June 26, 2025 update - Bandon emailed that he had also been wondering about the high TMP and asked OAWU one of the days they were out at the plant. Jason was able to figure out that we haven't done a CIP (Citric Acid) cleaning cycles for inorganic cleaning since a past operator named Dave Hancock due to a misunderstanding regarding the process. For Skid 1, he believes that flow rate probably stops registering whenever the flow is under 30gpm. He said that whenever the flow is under the 30 GPM it doesn't register to the finished Cl2 injection and with how old the filters are he has been having to progressively lower the skid 1 production rate. The TMP on skid 2 is now having issues and he had to slow the flow down a bit to prevent the TMP from triggering an alarm and will perform a CIP cleaning tomorrow ASAP.

Action Needed - continue troubleshooting.
 
Associated Violations: Viol #901543653, 05/01/2025 - 05/31/2025: SWTR - Failure to meet filter performance standard  See also: 07/01/2025, 06/16/2025, 06/05/2025, 05/30/2025



More information for this water system: SDWIS ID 3568
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA  ::  DW Source Protection

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List  ::  DW Source Protection

Main menu:
Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login